Goldwind Science & Technology Co., Ltd.
金风科技
An OEM built around permanent-magnet medium-speed onshore platforms — the 7H and 9H families from 7.2 MW to 10.5 MW — documented in the company's own EPDs and product brochures.
Company
- Founded
- 1998
- Headquarters
- Beijing, Beijing
- Ownership
- listed
- Listing
- SZSE: 002202; HKEX: 02208
- Employees
- 10,000 (2024)
- Nacelle capacity
- —
- Installed base
- 123 GW (2024)
- Website
- www.goldwind.com
As of June 2024 the group reported more than 123 GW installed, over 52,000 turbines in service across six continents and 43 countries, and more than 10,000 employees worldwide. Group headquarters are in Beijing; the listed entity is registered in Urumqi, Xinjiang. The portfolio covered here runs from the GWH170/GWH175/GWH182 medium-speed PMSG onshore platform (EPD published 2025) through the GWH204 Ultra onshore series launched on 17 October 2024. The GWH252 offshore variants are held on the exclusions page: trade coverage names them, but no Goldwind document archived here carries their specifications.
Model line-up
Filter full index →| Model | Rated | Rotor | Status |
|---|---|---|---|
| GWH300-20MW | 20 MW | 300 m | In production |
| GWH204-10MW | 10 MW | 204 m | In production |
| GWH182-8.0 | 8 MW | 182 m | In production |
| GWH170-7.2 | 7.2 MW | 170 m | In production |
2 further models from this manufacturer are held back pending an official source — see the exclusions list.
Sources for this profile
- [1]“EPDItaly 0852 - Goldwind GWH170-7.2 / GWH175-7.8 / GWH182-8.0 wind turbine EPD (issued 2025-02-10),” epditaly.it. Accessed: Nov. 18, 2026. [Online]. Available: https://www.epditaly.it/en/wp-content/uploads/2016/12/4-2-Goldwind_EPD_GWH170-7.2GWH175-7.8GWH182-8.0-V20250210.pdf OEM document
- [2]“中国电力报 - 金风科技 GWH204 Ultra 陆上机组发布报道 (2024-10-28),” cpnn.com.cn. Accessed: Nov. 18, 2026. [Online]. Available: https://www.cpnn.com.cn/qiye/jishu2023/202410/t20241028_1746653.html
- [3]“offshoreWIND.biz - China Three Gorges grid-connects world's first 20 MW wind turbine installed offshore (2026-02-06),” offshorewind.biz. Accessed: Nov. 18, 2026. [Online]. Available: https://www.offshorewind.biz/2026/02/06/china-three-gorges-grid-connects-worlds-first-20-mw-wind-turbine-installed-offshore